The project was to dig a well and construct a holding tank.

Mark reports:

All told, the work to dig the well took 6 weeks work, two men a day digging.

We spent about $1,400 in total, $900 from the community together with $500 from Appropriate Projects.

A little structure was built overhead to protect it from rain.

The water tastes great and is plentiful. However, we intend to do a study to ensure that is safe to continue drinking.

Mark extended his thanks and that the school in El Alto del Aguacate.